Best Practices - Weekly CO Checks
Repeatable Engine Load Test
Repeatable Engine Load Test
Torque Converter Transmissions
Prepare the Machine for Test
Engine Load TestWarm up the engine (emissions change for cold and warm engines) Park the machine into an intake entry with vehicle facing the mine rib Set brakes and chock the wheels Sample exhaust emissions before any after treatment devices, i.e., before catalytic converter, particulate trap, fume diluters, and water scrubber
Evaluation and InterpretationMake sure no personnel are in front or behind the machine Set transmission gear Full throttle to induce converter stall for about 60 seconds Sample allowing reading to stabilize and record measurement Release throttle and shift transmission out of gear Allow torque converter to cool for a few minutes Repeat the test using the same method every week for comparable results Sampling with CO measurement device at idle, prior to torque stall, will allow for quicker sampling and shorter stall tests Using a tachometer to verify the engine speed at load will help weekly repeatability
Check for changes in CO concentration against the baseline you have established for the engine Increases in CO concentration level above the established baseline indicates problems Contact MSHA Technical Support for guidance on engine CO information Maintain records to track engine performance A chart of individual equipment emissions plotted over time (weekly) A logbook separated into individual equipment for easy weekly comparison A logbook separated into similar engines